Trace the productive time that remains
OEE = availability × performance × quality. A planned 480-minute shift runs for 360 minutes. At 30 seconds per part, 600 total parts need 300 ideal minutes; 540 good parts represent 270 fully productive minutes. OEE is 270 ÷ 480 = 56.25%.

